How to change the settings of the schedule view?

From MedITEX - Wiki

(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
 
<p style="text-align: left;"><span id="result_box" lang="en"><span class="hps alt-edited">There are many options</span> <span class="hps">to change the settings</span> <span class="hps">of views</span><span>.</span></span></p>
 
<p style="text-align: left;"><span id="result_box" lang="en"><span class="hps alt-edited">There are many options</span> <span class="hps">to change the settings</span> <span class="hps">of views</span><span>.</span></span></p>
<p style="text-align: left;">All view settings are also described individually in the <a href="/index.php?title=MedITEX_Scheduler_how_to...">How to</a>.</p>
+
<p style="text-align: left;">All view settings are also described individually in the <a href="/index.php?title=MedITEX_Scheduler_how_to...#Scheduler_views">How to</a>.</p>
<table border="0">
+
<table style="margin-left: auto; margin-right: auto;" border="0">
 
<tbody>
 
<tbody>
 
<tr>
 
<tr>
<td><img src="/images/MainWindowSettingsRed.png" alt="" width="765" height="478" /></td>
+
<td>[[Image:/images/MainWindowSettingsRed.png.png|none|740px|thumb|left|link=http://wiki.meditex-software.com/images//images/MainWindowSettingsRed.png.png|]]</td>
 
</tr>
 
</tr>
 
</tbody>
 
</tbody>
 
</table>
 
</table>
<table border="0" width="765" height="252">
+
<p>&nbsp;</p>
 +
<table style="margin-left: auto; margin-right: auto;" border="0" width="765" height="252">
 
<tbody>
 
<tbody>
 
<tr>
 
<tr>
<td rowspan="5"><img style="float: left;" src="/images/Del.png" alt="" width="146" height="103" /></td>
+
<td rowspan="5"><img style="float: left;" src="/images/Del.png" alt="" width="140" height="99" /></td>
 
<td>
 
<td>
<p><strong>1. The area of the resource selection:</strong></p>
+
<p><strong>1. The area of the resource selection</strong></p>
 
</td>
 
</td>
 
</tr>
 
</tr>
Line 19: Line 20:
 
<td>
 
<td>
 
<ul>
 
<ul>
<li>With a  click on the button &ldquo;Define&rdquo; you  can open a list with all      existing and  active resources, which were  defined in the settings.      With this list it  is possible to vary the order  of resources. Read    more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.</li>
+
<li>Clicking on "Define" you  can open a list with all      existing and  active resources, which were  defined in the settings.      With this list it  is possible to change the order  of resources. Read    more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.</li>
 
</ul>
 
</ul>
 
</td>
 
</td>
Line 26: Line 27:
 
<td>
 
<td>
 
<ul>
 
<ul>
<li>With the button "All" every available resources of the clinic are shown in the schedule.</li>
+
<li>&nbsp;"All" displays every available resource of the clinic in the schedule.</li>
 
</ul>
 
</ul>
 
</td>
 
</td>
Line 40: Line 41:
 
<td>
 
<td>
 
<ul>
 
<ul>
<li>With a  click on the button &ldquo;Special selection&rdquo; you  can open a list    with all  existing and  active resources, which were  defined in the    settings. In this list it  is possible to vary the order  of  resources  by    moving  the  selected  resource it up or down using  the    corresponding    buttons  on the  right  side. Read more <a href="/index.php?title=Scheduler_main_page#Special_selection">here</a>.</li>
+
<li>Clicking on &ldquo;Special selection&rdquo; you  can open a list    with all  existing and  active resources, which were  defined in the    settings. In this list it  is possible to change the order  of  resources  by    moving  the  selected  resource up or down, using  the    corresponding    buttons  on the  right  side. Read more <a href="/index.php?title=Scheduler_main_page#Special_selection">here</a>.</li>
 
</ul>
 
</ul>
 
</td>
 
</td>
Line 46: Line 47:
 
</tbody>
 
</tbody>
 
</table>
 
</table>
<table border="0" width="760" height="331">
+
<p>&nbsp;</p>
 +
<table style="margin-left: auto; margin-right: auto;" border="0" width="760" height="331">
 
<tbody>
 
<tbody>
 
<tr>
 
<tr>
Line 78: Line 80:
 
<td>
 
<td>
 
<ul>
 
<ul>
<li>If &ldquo;Day view&rdquo; is active, it's possible to select several days in the months navigation. Take a look at the <a href="/index.php?title=How_to_select_several_days_in_the_schedule%3F">view of several days</a>.</li>
+
<li>If "Day view" is active, it's possible to select several days in the months navigation. Take a look at the <a href="/index.php?title=How_to_select_several_days_in_the_schedule%3F">view of several days</a>.</li>
 
</ul>
 
</ul>
 
</td>
 
</td>
Line 84: Line 86:
 
</tbody>
 
</tbody>
 
</table>
 
</table>
<p style="text-align: left;">&nbsp;</p>
 
 
<table style="float: right;" border="0">
 
<table style="float: right;" border="0">
 
<tbody>
 
<tbody>
Line 93: Line 94:
 
</tbody>
 
</tbody>
 
</table>
 
</table>
<p><span class="mw-headline"><br /></span></p>
 

Revision as of 15:47, 14 November 2012

There are many options to change the settings of views.

All view settings are also described individually in the <a href="/index.php?title=MedITEX_Scheduler_how_to...#Scheduler_views">How to</a>.

<tbody> </tbody>

 

<tbody> </tbody>
<img style="float: left;" src="/images/Del.png" alt="" width="140" height="99" />

1. The area of the resource selection

  • Clicking on "Define" you can open a list with all existing and active resources, which were defined in the settings. With this list it is possible to change the order of resources. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.
  •  "All" displays every available resource of the clinic in the schedule.
  • All groups that contain at least one resource are listed in the drop-down box beneath “Resource selection”. If you select one of these groups, all resources belonging to this group will immediately be displayed in the schedule. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.
  • Clicking on “Special selection” you can open a list with all existing and active resources, which were defined in the settings. In this list it is possible to change the order of resources by moving the selected resource up or down, using the corresponding buttons on the right side. Read more <a href="/index.php?title=Scheduler_main_page#Special_selection">here</a>.

 

<tbody> </tbody>
<img src="/images/ViewOptions.PNG" alt="" width="146" height="371" /> 2. Area of the view options:

 

  • By clicking the "D" button, the day view will be shown. Take a look at the <a href="/index.php?title=How_to_change_the_schedule_view_to_be_displayed_by_days%3F">day view</a>.

 

  • By clicking the "W" button, the work week view will be shown. Take a look at the view of a <a href="/index.php?title=How_to_change_the_schedule_view_to_be_displayed_by_work_weeks%3F">work week</a>.
  • By clicking the "T" button, the view in a time grid will be shown. Take a look at the <a href="/index.php?title=How_to_change_the_schedule_view_to_display_a_time_grid%3F">time grid view</a>.
  • If "Day view" is active, it's possible to select several days in the months navigation. Take a look at the <a href="/index.php?title=How_to_select_several_days_in_the_schedule%3F">view of several days</a>.
<tbody> </tbody>
<a href="/index.php?title=MedITEX_Scheduler_how_to...">Back to How to...</a> <a href="#top">Back to top</a>