How to change the settings of the schedule view?

From MedITEX - Wiki

(Difference between revisions)
Jump to: navigation, search
Line 13: Line 13:
 
<tr>
 
<tr>
 
<td><img src="/images/Del.png" alt="" width="140" height="99" /></td>
 
<td><img src="/images/Del.png" alt="" width="140" height="99" /></td>
<td>
 
<ul>
 
<li>With a  click on the button &ldquo;Define&rdquo; you  can open a list with all    existing and  active resources, which were  defined in the settings.  With this list it  is possible to vary the order  of resources. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.</li>
 
<li><span id="result_box" lang="en"><span class="hps">With the button</span> <span class="hps">"All"</span> <span class="hps">all</span> <span class="hps">available</span> <span class="hps">resources</span> <span class="hps">of the clinic </span><span class="hps">are shown.</span></span></li>
 
<li>All  groups that contain at least one resource are listed in the  drop-down  box beneath &ldquo;Resource selection&rdquo;. If you select one of these  groups, all  resources belonging to this group will immediately be  displayed in the schedule. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.</li>
 
<li>With a  click on the button &ldquo;Special selection&rdquo; you  can open a list  with all  existing and  active resources, which were  defined in the  settings. In this list it  is possible to vary the order  of resources by    moving  the  selected  resource it up or down using the  corresponding    buttons  on the  right  side. Read more <a href="/index.php?title=Scheduler_main_page#Special_selection">here</a>. </li>
 
</ul>
 
</td>
 
 
</tr>
 
</tr>
 
</tbody>
 
</tbody>
 
</table>
 
</table>
 +
<ul>
 +
<li>With a  click on the button &ldquo;Define&rdquo; you  can open a list with all    existing and  active resources, which were  defined in the settings.    With this list it  is possible to vary the order  of resources. Read  more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.</li>
 +
</ul>
 +
<ul>
 +
<li><span id="result_box" lang="en"><span class="hps">With the button</span> <span class="hps">"All"</span> <span class="hps">all</span> <span class="hps">available</span> <span class="hps">resources</span> <span class="hps">of the clinic </span><span class="hps">are shown.</span></span></li>
 +
</ul>
 +
<ul>
 +
<li>All  groups that contain at least one resource are listed in the  drop-down  box beneath &ldquo;Resource selection&rdquo;. If you select one of these  groups, all  resources belonging to this group will immediately be  displayed in the schedule. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.</li>
 +
</ul>
 +
<ul>
 +
<li>With a  click on the button &ldquo;Special selection&rdquo; you  can open a list  with all  existing and  active resources, which were  defined in the  settings. In this list it  is possible to vary the order  of resources  by    moving  the  selected  resource it up or down using the  corresponding    buttons  on the  right  side. Read more <a href="/index.php?title=Scheduler_main_page#Special_selection">here</a>. </li>
 +
</ul>
 
<table border="0">
 
<table border="0">
 
<tbody>
 
<tbody>
Line 31: Line 35:
 
</tbody>
 
</tbody>
 
</table>
 
</table>
<p>&nbsp;</p>
 
 
<p>&nbsp;</p>
 
<p>&nbsp;</p>
 
<p>&nbsp;</p>
 
<p>&nbsp;</p>

Revision as of 17:30, 13 November 2012

There are many options to change the settings of views:

<tbody> </tbody>
MainWindowSettingsRed.png


1. The area of the resource selection:

<tbody> </tbody>
<img src="/images/Del.png" alt="" width="140" height="99" />
  • With a click on the button “Define” you can open a list with all existing and active resources, which were defined in the settings. With this list it is possible to vary the order of resources. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.
  • With the button "All" all available resources of the clinic are shown.
  • All groups that contain at least one resource are listed in the drop-down box beneath “Resource selection”. If you select one of these groups, all resources belonging to this group will immediately be displayed in the schedule. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.
  • With a click on the button “Special selection” you can open a list with all existing and active resources, which were defined in the settings. In this list it is possible to vary the order of resources by moving the selected resource it up or down using the corresponding buttons on the right side. Read more <a href="/index.php?title=Scheduler_main_page#Special_selection">here</a>.
<tbody> </tbody>
<img src="/images/ViewOptions.PNG" alt="" width="146" height="371" />

 

 

<tbody> </tbody>
<a href="/index.php?title=MedITEX_Scheduler_how_to...">Back to How to...</a> <a href="#top">Back to top</a>