Cycle Details

From MedITEX - Wiki

(Difference between revisions)
Jump to: navigation, search
Line 9: Line 9:
 
</tbody>
 
</tbody>
 
</table>
 
</table>
 +
<ul>
 +
<li>Check again if the correct names of the patient and her current partner are displayed on top of the window.</li>
 +
<li>If the patient has been taken over from another center, you can display  an overview of most IVF practices and centers including their public  center IDs by double-clicking the empty field <strong>&ldquo;Taken over from&rdquo;</strong>.</li>
 +
<li>Click the <strong>gray shaded triangle</strong> to the left of the field for the date to enter a reference date for the therapy. Preferentially (if known), use the date of the last period (<strong>Date LMP</strong>). If the date of the last period is not known or not available (Therapy from amenorrhea), enter a &ldquo;<strong>Therapy start</strong>&rdquo;.</li>
 +
<li>If you calculate on the basis of <strong>cycle days</strong>, set the patient's current  cycle day. Now press the <strong>lightning symbol</strong>. The date of the last period  or the therapy start will be calculated <strong>automatically</strong>.</li>
 +
<li>The start date is only an approximate indication which can refer to the  first stimulation day, for example. MedITEX IVF uses this date to  chronologically classify the planned therapy.</li>
 +
</ul>
 +
<p>&nbsp;</p>
 
<p>&nbsp;</p>
 
<p>&nbsp;</p>
 
<h2>Additional measures</h2>
 
<h2>Additional measures</h2>

Revision as of 16:32, 11 January 2013

Contents

General

<tbody> </tbody>

CycleDetails1.png

  • Check again if the correct names of the patient and her current partner are displayed on top of the window.
  • If the patient has been taken over from another center, you can display an overview of most IVF practices and centers including their public center IDs by double-clicking the empty field “Taken over from”.
  • Click the gray shaded triangle to the left of the field for the date to enter a reference date for the therapy. Preferentially (if known), use the date of the last period (Date LMP). If the date of the last period is not known or not available (Therapy from amenorrhea), enter a “Therapy start”.
  • If you calculate on the basis of cycle days, set the patient's current cycle day. Now press the lightning symbol. The date of the last period or the therapy start will be calculated automatically.
  • The start date is only an approximate indication which can refer to the first stimulation day, for example. MedITEX IVF uses this date to chronologically classify the planned therapy.

 

 

Additional measures

Additional measures

<tbody> </tbody>
<img src="/images/CycleDetails2.png" alt="" width="254" height="107" />
  • None
  • Coculture
  • Assisted hatching
  • Cryopreservation
  • Polar body biopsy
  • PGD

 

 

 

 

 

 

 

 

PBD Indication

Only visible at saved cycles.

<tbody> </tbody>
<img src="/images/CycleDetails3.png" alt="" width="260" height="105" />
  • Age
  • ART w/o pregnancy
  • ART w abort
  • Abort w/o ART
  • Patient request
  • Translocation
  • Other
  • Monogenetic illness

 

 

 

 

 

 

 

 

 

<tbody> </tbody>
<a href="/index.php?title=MedITEX_IVF_manual">Back to the MedITEX IVF menu </a> <a href="#top">Back to top</a>