How to change the settings of the schedule view?

From MedITEX - Wiki

(Difference between revisions)
Jump to: navigation, search
 
(36 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<p style="text-align: left;"><span id="result_box" lang="en"><span class="hps alt-edited">There are many options</span> <span class="hps">to change the settings</span> <span class="hps">of views</span><span>:</span></span></p>
+
<p style="text-align: left;"><span id="result_box" lang="en"><span class="hps alt-edited">There are many options</span> <span class="hps">to change the settings</span> <span class="hps">of views</span><span>.</span></span></p>
<table style="float: left;" border="0">
+
<table border="0">
 
<tbody>
 
<tbody>
 
<tr>
 
<tr>
<td style="text-align: center;">[[Image:MainWindowSettingsRed.png|none|745px|thumb|left|link=http://wiki.meditex-software.com/images/MainWindowSettingsRed.png|]]</td>
+
<td><img src="/images/howto48.png" alt="" width="48" height="48" /></td>
 +
<td>All view settings are also described individually in the <a href="/index.php?title=MedITEX_Scheduler_how_to...#Scheduler_views">How to</a>.</td>
 
</tr>
 
</tr>
 
</tbody>
 
</tbody>
 
</table>
 
</table>
<p style="text-align: left;"><span lang="en"><span><br /></span></span></p>
+
<p style="text-align: left;">&nbsp;</p>
<p>1. The area of the resource selection:</p>
+
<table style="margin-left: auto; margin-right: auto;" border="0">
<table border="0">
+
 
<tbody>
 
<tbody>
 
<tr>
 
<tr>
<td><img src="/images/Del.png" alt="" width="140" height="99" /></td>
+
<td>[[Image:MainWindowSettingsRed.png|none|740px|thumb|left|link=http://wiki.meditex-software.com/images/MainWindowSettingsRed.png|]]</td>
 +
</tr>
 +
</tbody>
 +
</table>
 +
<p>&nbsp;</p>
 +
<table style="margin-left: auto; margin-right: auto;" border="0" width="765" height="252">
 +
<tbody>
 +
<tr>
 +
<td rowspan="5"><img style="float: left;" src="/images/Del.png" alt="" width="140" height="99" /></td>
 +
<td>
 +
<p><strong>1. The area of the resource selection</strong></p>
 +
</td>
 +
</tr>
 +
<tr>
 
<td>
 
<td>
 
<ul>
 
<ul>
<li>With a  click on the button &ldquo;Define&rdquo; you  can open a list with all   existing and  active resources, which were  defined in the settings.   With this list it  is possible to vary the order  of resources. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.</li>
+
<li>Clicking on <strong>Define</strong> you  can open a list with all       existing and  active resources, which were  defined in the settings.     With this list it  is possible to change the order  of resources. Read   more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.</li>
<li><span id="result_box" lang="en"><span class="hps">With the button</span> <span class="hps">"All"</span> <span class="hps">all</span> <span class="hps">available</span> <span class="hps">resources</span> <span class="hps">of the clinic </span><span class="hps">are shown.</span></span></li>
+
</ul>
<li>All  groups that contain at least one resource are listed in the drop-down  box beneath &ldquo;Resource selection&rdquo;. If you select one of these groups, all  resources belonging to this group will immediately be displayed in the schedule. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.</li>
+
</td>
<li>With a  click on the button &ldquo;Special selection&rdquo; you  can open a list with all  existing and  active resources, which were  defined in the settings. In this list it  is possible to vary the order  of resources by    moving  the  selected  resource it up or down using the corresponding    buttons  on the  right  side. Read more <a href="/index.php?title=Scheduler_main_page#Special_selection">here</a>. </li>
+
</tr>
 +
<tr>
 +
<td>
 +
<ul>
 +
<li>&nbsp;<strong>All</strong> displays every available resource of the clinic in the schedule.</li>
 +
</ul>
 +
</td>
 +
</tr>
 +
<tr>
 +
<td>
 +
<ul>
 +
<li>All  groups that contain at least one resource are listed in the     drop-down  box beneath <strong>Resource selection</strong>. If you select one of these     groups, all  resources belonging to this group will immediately be     displayed in the schedule. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.</li>
 +
</ul>
 +
</td>
 +
</tr>
 +
<tr>
 +
<td>
 +
<ul>
 +
<li>Clicking on <strong>Special selection</strong> you  can open a list     with all  existing and  active resources, which were  defined in the     settings. In this list it  is possible to change the order  of resources   by    moving  the  selected  resource up or down, using  the    corresponding    buttons  on the  right  side. Read more <a href="/index.php?title=Scheduler_main_page#Special_selection">here</a>.</li>
 
</ul>
 
</ul>
 
</td>
 
</td>
Line 24: Line 55:
 
</tbody>
 
</tbody>
 
</table>
 
</table>
<table border="0">
+
<p>&nbsp;</p>
 +
<table style="margin-left: auto; margin-right: auto;" border="0" width="760" height="331">
 
<tbody>
 
<tbody>
 
<tr>
 
<tr>
<td><img src="/images/ViewOptions.PNG" alt="" width="146" height="371" /></td>
+
<td rowspan="5"><img src="/images/ViewOptions.PNG" alt="" width="146" height="371" /></td>
 +
<td><strong>2. Area of the view options:</strong></td>
 
</tr>
 
</tr>
</tbody>
+
<tr>
</table>
+
<td>
<p>&nbsp;</p>
+
 
<p>&nbsp;</p>
 
<p>&nbsp;</p>
 +
<ul>
 +
<li>By clicking the <strong>D</strong> button, the day view will be shown.&nbsp;Take a look at the <a href="/index.php?title=How_to_change_the_schedule_view_to_be_displayed_by_days%3F">day view</a>.</li>
 +
</ul>
 
<p>&nbsp;</p>
 
<p>&nbsp;</p>
 +
</td>
 +
</tr>
 +
<tr>
 +
<td>
 +
<ul>
 +
<li>By clicking the <strong>W</strong> button, the work week view will be shown. Take a look at the view of a <a href="/index.php?title=How_to_change_the_schedule_view_to_be_displayed_by_work_weeks%3F">work week</a>.</li>
 +
</ul>
 +
</td>
 +
</tr>
 +
<tr>
 +
<td>
 +
<ul>
 +
<li>By clicking the <strong>T </strong>button, the view in a time grid will be shown. Take a look at the <a href="/index.php?title=How_to_change_the_schedule_view_to_display_a_time_grid%3F">time grid view</a>.</li>
 +
</ul>
 +
</td>
 +
</tr>
 +
<tr>
 +
<td>
 +
<ul>
 +
<li>If <strong>Day view</strong> is active, it's possible to select several days in the months navigation. Take a look at the <a href="/index.php?title=How_to_select_several_days_in_the_schedule%3F">view of several days</a>.</li>
 +
</ul>
 +
</td>
 +
</tr>
 +
</tbody>
 +
</table>
 
<table style="float: right;" border="0">
 
<table style="float: right;" border="0">
 
<tbody>
 
<tbody>
 
<tr>
 
<tr>
<td style="text-align: right;"><a href="/index.php?title=MedITEX_Scheduler_how_to...">Back to How to...</a></td>
+
<td style="text-align: right;"><a href="/index.php?title=MedITEX_Scheduler_how_to">Back to How to</a></td>
 
<td style="text-align: right;"><a href="#top">Back to top</a></td>
 
<td style="text-align: right;"><a href="#top">Back to top</a></td>
 
</tr>
 
</tr>

Latest revision as of 16:42, 12 February 2013

There are many options to change the settings of views.

<tbody> </tbody>
<img src="/images/howto48.png" alt="" width="48" height="48" /> All view settings are also described individually in the <a href="/index.php?title=MedITEX_Scheduler_how_to...#Scheduler_views">How to</a>.

 

<tbody> </tbody>
MainWindowSettingsRed.png

 

<tbody> </tbody>
<img style="float: left;" src="/images/Del.png" alt="" width="140" height="99" />

1. The area of the resource selection

  • Clicking on Define you can open a list with all existing and active resources, which were defined in the settings. With this list it is possible to change the order of resources. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.
  •  All displays every available resource of the clinic in the schedule.
  • All groups that contain at least one resource are listed in the drop-down box beneath Resource selection. If you select one of these groups, all resources belonging to this group will immediately be displayed in the schedule. Read more <a href="/index.php?title=How_to_define_groups_or_sets_of_resources%3F">here</a>.
  • Clicking on Special selection you can open a list with all existing and active resources, which were defined in the settings. In this list it is possible to change the order of resources by moving the selected resource up or down, using the corresponding buttons on the right side. Read more <a href="/index.php?title=Scheduler_main_page#Special_selection">here</a>.

 

<tbody> </tbody>
<img src="/images/ViewOptions.PNG" alt="" width="146" height="371" /> 2. Area of the view options:

 

  • By clicking the D button, the day view will be shown. Take a look at the <a href="/index.php?title=How_to_change_the_schedule_view_to_be_displayed_by_days%3F">day view</a>.

 

  • By clicking the W button, the work week view will be shown. Take a look at the view of a <a href="/index.php?title=How_to_change_the_schedule_view_to_be_displayed_by_work_weeks%3F">work week</a>.
  • By clicking the T button, the view in a time grid will be shown. Take a look at the <a href="/index.php?title=How_to_change_the_schedule_view_to_display_a_time_grid%3F">time grid view</a>.
  • If Day view is active, it's possible to select several days in the months navigation. Take a look at the <a href="/index.php?title=How_to_select_several_days_in_the_schedule%3F">view of several days</a>.
<tbody> </tbody>
<a href="/index.php?title=MedITEX_Scheduler_how_to">Back to How to</a> <a href="#top">Back to top</a>